Our Process — From Quote to Completion

    Most landscape companies make their process invisible. We make ours transparent. Here's exactly what happens from the moment you call us to the moment we walk off your property — for every service we offer.

    Lawn Care Programs

    1. 1

      Inquiry & site visit (Day 1–3)

      You call, text, or email. We respond within a few hours. Site visit typically within 3–5 days.

    2. 2

      Property walk + quote (Day 3–5)

      We measure mowable square footage, identify edge work, obstacles, and access. Written quote within 24–48 hours.

    3. 3

      Schedule first service (Day 5–10)

      Approved quotes start within a week. We email your full schedule (weekly day + arrival window).

    4. 4

      Weekly visits (May–October)

      Same crew, same day, 30–60 minutes on-site. Mowing, edge trimming, blow-down, optional bagging. Season program billing.

    5. 5

      Communication touch-points

      We text if rain delays. Mid-season check-in (early August). End-of-season recap when programs wrap.

    6. 6

      Renewal (April of next year)

      Quick text in early April to confirm your next-season program — no auto-renew, no surprises.

    Paver Patio / Driveway Installation

    1. 1

      Inquiry & site visit (Day 1–5)

      We bring physical paver samples to your property so you can see real colors and textures in your own light.

    2. 2

      Design conversation (45–60 min on-site)

      Measure, show samples, discuss patterns, sketch concepts. Identify complications — slope, drainage, access, removal of existing surfaces.

    3. 3

      Written quote (within 48 hours)

      Itemized: paver style + quantity, base prep, edge restraint, polymeric sand, removal, drainage, and clean-up.

    4. 4

      Approval + deposit

      25% deposit for projects over $5,000. Lead time 2–4 weeks during peak season.

    5. 5

      Day-of-install: site setup

      Crew on-site at 7:30 AM. Tarp and protect lawn, beds, and existing hardscape. Mark utilities before any digging.

    6. 6

      Excavation

      8–10 inches for patios, 10–12 inches for driveways. Soil hauled off-site — no spoil piles left behind.

    7. 7

      Base preparation

      Geotextile fabric laid first. Class A gravel placed in 4-inch lifts, each lift compacted with a plate compactor. No shortcuts here — base is everything.

    8. 8

      Edge restraint

      Spike-down plastic edge restraint installed at engineered intervals. This is what keeps your pavers from spreading over time.

    9. 9

      Paver laying

      Pattern-true, with wet-saw cuts done on-site for clean, precise edges.

    10. 10

      Polymeric sand jointing

      Sand worked into every joint, compacted, then misted to activate the binder.

    11. 11

      Final compaction + clean

      Full-area compaction. All debris hauled. Patio ready to use in 24–48 hours.

    12. 12

      Walk-through + warranty paperwork

      Manufacturer warranty paperwork handed over. Final invoice on completion.

    13. 13

      Polymeric sand re-application (after first rain)

      We come back to top up any joints that settled. Always included — never an upcharge.

    Retaining Wall / Hardscape

    1. 1

      Inquiry & site visit

      Same friendly process — and we discuss whether engineered drawings will be needed (any wall over 4 ft).

    2. 2

      Design + engineering

      Walls over 4 ft: we coordinate stamped engineered drawings (1–2 weeks). Smaller walls go directly to quote.

    3. 3

      Permit (when required)

      Walls 4 ft and taller need a building permit. We submit using the engineered drawings. Municipal turnaround typically 2–3 weeks.

    4. 4

      Materials staging

      Stone, gravel, drainage tile, and geogrid all delivered before the crew arrives.

    5. 5

      Excavation

      Trench dug 12–18 inches below grade for proper base depth.

    6. 6

      Drainage installation

      Perforated drain tile wrapped in a geotextile sock at the base of the wall, daylighted to a safe outlet.

    7. 7

      Base + first course

      6–12 inches of Class A gravel, fully compacted. First course laid with millimeter-precision — every course above depends on it.

    8. 8

      Wall construction

      Course-by-course build. Geogrid layers at engineered intervals on walls over 4 ft. Drainage backfill (clean stone) placed behind the wall as it rises.

    9. 9

      Capstone + adhesive

      Caps set with hardscape adhesive — never loose. Safer, cleaner, longer-lasting.

    10. 10

      Final grading + topsoil

      Disturbed areas regraded, topsoil reinstated, grass seed applied where appropriate.

    11. 11

      Walk-through + warranty

      Full project walk-through with you before we leave.

    Outdoor Construction (Decks, Pergolas, Gazebos)

    1. 1

      Inquiry, site visit + design

      Sketch options, walk through material comparisons, lock in feature decisions.

    2. 2

      Permit coordination

      Most attached decks need a permit — we handle the application end-to-end.

    3. 3

      Material ordering

      Pressure-treated: next-day availability. Cedar: 1–2 weeks. Composite: 2–4 weeks.

    4. 4

      Foundation

      Concrete piers, deck blocks, or full footings — chosen based on size, height, and ground conditions.

    5. 5

      Framing

      Beams and joists set and leveled. Inspections scheduled if the permit requires it.

    6. 6

      Decking + railing

      Hidden fasteners or face-screwed depending on the spec. Railings always built to code.

    7. 7

      Stairs + finishing

      Skirting, fascia, and finishing details installed last for a clean look.

    8. 8

      Stain / sealing (optional)

      Applied during the build or scheduled later, depending on material and weather.

    9. 9

      Final inspection + walk-through

      Permit inspection if required. Full walk-through with you.

    Spring or Fall Cleanup

    1. 1

      Inquiry — book early, slots fill

      Spring: book by mid-April. Fall: book by early September.

    2. 2

      Quote

      Based on lot size, debris volume, and number of garden beds.

    3. 3

      Schedule

      Spring: late April through mid-May. Fall: late October through mid-November.

    4. 4

      Day of service

      2–4 hours standard. Spring includes debris removal, bed cleanout, edging, mulch top-up, de-thatching, and first mow. Fall includes final mow, full leaf removal + haul, bed winterization, and perennial cutback.

    5. 5

      Walk-through

      We confirm everything meets your standard before invoicing.

    What's constant across every service

    • Direct-hired crew — no third-party day-laborers.
    • One point of contact — a real person on our team answers 902-316-0227.
    • Real local accountability — 84 Kenwood Circle, Charlottetown.
    • Honest quotes, no upcharges — quote = price unless scope changes.
    • Same-day and next-day responsiveness.

    Ready to start your project?

    Call or text us directly — we'll walk you through every step before any work begins.